[sketch] MVP ventilation
Rear - Outflow
50 CFM outflow from rear via dedicated $100 blower.
It turns out a more standard blower is probably not ideal for the high static pressure of a 3" pipe run.
A radon fan may be more suitable, at a slight increase in purchase cost and running cost.
Main radon fan manufacturers appear to be RadonAway & Fantech, some options:
Leaning towards Festa AMG Triumph ECS
Table of fan comparisons
Exhaust fan options: 3" iron pipe, ~20 ft vertical, 2–3 × 45°, open top
Annual cost = max rated watts × 8,760 h × $0.29/kWh (Con Ed residential, 2026). Commercial accounts run ~15–25% lower. "Est. on pipe" = estimated operating point on this run. "—" = not published / not found.
Rn4EC-3 rated points (3" duct): 100%: 36 CFM @ 4.5" (146 W), 210 CFM @ 0.2" (173 W). 80%: 29 CFM @ 3.19" (88 W), 180 CFM @ 0.2" (126 W). 60%: 20 CFM @ 1.75" (40 W), 130 CFM @ 0.2" (57 W).
Notes for coffee roasting exhaust (1 kg electric, tented):
- Measure air temp at the fan inlet during the darkest roast. Above ~104°F, only the 1TDV2 is rated for it.
- Oil residue condenses as smoke cools. Scroll blowers can be opened and cleaned; radon fans are sealed and effectively consumable in this use.
- Use a washable mesh/baffle grease filter at the tent outlet.
- Fan at the top (pulling) keeps the iron pipe under suction, so leaks in the ceiling space draw air in rather than leaking smoke out.
- Add a cleanout/drip cup at the bottom of the vertical run.
- Est. on-pipe figures are rough calculations, not measurements.
Reduces roasting impact, improves CO2 and VOC reduction.
Front - Inflow/Outflow switchable
Big dust collection blower near hatch.
With longer hoses on in/out, could swap between inflow/outfow.
Hose can hook on to 1/2 opened hatch door.
Would be better with ducting, but routing past electrical panel and lift would be difficult.
Inflow
Set up for inflow, would work in tandem with rear exhaust.
Outflow
Set up for exhaust, could make the front area suitable for painting/staining.
Would benefit from cordoning off area to avoid drafts to upstairs or rest of basement.
Probably doesn't need to be entirely enclosed to help.
Next Steps
To improve outflow from rear, add additional exhaust:
- ...via 4-6" round conduit, routed through gym square duct and window
- ...vita large diameter duct through 1st floor mainspace bathroom, to roof. (Could have inline register in bathroom)
To improve incoming airflow from front, add additional incoming ducting:
- ...from right front facade window upper sash panel, routed to basement via duct tucked into the corner



