2025 Electrical rehab plan
Big Picture
- Gain better understanding of power routing
- 3 phase leg balance (if still relevant)
- Panel -> sub panel routing (identify lines fed from glass sub-panel)
- Examine three-phase lines running into space (gym fan, switch in center of main space), determine if they can be used to supply 110 lines, determine what 110 lines are already being branched from them.
- Replace worn outlets
- Resolve faulty outlet issues (map below). Most faults may be resolved by replacing outlet, and the new ground from recent mains upgrade.
- Resolve faulty outlet issues (map below). Most faults may be resolved by replacing outlet, and the new ground from recent mains upgrade.
- Check for old failure-prone fabric wiring
- Ensure matching breaker/wire ratings.
- Create easier and more reliable/independent pantry frig power management via dedicated lines with clustered switching panel.
- Give kitchen generous dedicated power to avoid conflicts with other space usage, and ability to dependably run all fridges, and operate multiple appliances at once.
- Replace glass fuses with breaker-fuses, map lines, label
- Install additional breakers and stub lines to feed basement/basement rear? (110? 220?)
- Install Marks recommended lighting remote option (Lutron?) to create better switch placement for 1st floor light control?
Maps (blank maps here)
Reference material
Map of known 1st floor outlet faults: